Styrene modified alkyd resin, fast-drying, semi-matte industrial paint primer with anticorrosive pigments.

Surface Preparation&Application
Surfaces should be cleaned of old paint film, oil, dust, dirt, moist, chloride, sulphate salts, rust, rolled mud, tempering, casting - welding burrs etc. which will reduce adhesion on the application surface . Metal surfaces must be sanded at minimum Sa2 ½ (ISO 8501-1, SSPC-SP10) (sand blasting), prime the sanded surface with Industrial Antirust Primer in 6 hours. Thin the product according to the application equipment, than mix thoroughly until it becomes homogenous. After the primer has fully dried (in 4 to 6 hours), the finishing coat paint can be applied. The surface temperature must be minimum 3 Celsius degrees higher than the dew temperature. Application at temperatures near the dew point is not recommended. For the topcoat application wait for 24 hours between coats. Application Temperature: Min. +10°C / Max. + 30°C

Thinning / Blending Ratio
One component / Polisel Cellulosic & Poli HRM thinner 15 - 20%

Coverage Area
6-7 m²/L or 4-5 m²/kg (50 - -60 µ DFT)

Drying Time
Touch dry in 20-30 minutes and hard dry in 24 hours.

Recommended Application Tools
Air - airless spray

Package
18 kg

Sitemizin işlemesini sağlamak için çerezler kullanılmaktadır. Detaylı bilgi almak için Polisan Kansai Çerez Aydınlatma Metni'ni incelemenizi rica ederiz.